Guide 06 · Do

Flooring Installation Prep Checklist

Install day goes well when the crew walks into an empty room with a clear path, and the decisions were made the week before. Here is the countdown, as a checklist you can tick off.

  • Use it whenInstall is booked and you want nothing to go wrong on the day.
  • Reading timeAbout 7 minutes
  • Tool on this pageCountdown checklist saved in your browser

Most installation delays are not caused by the crew. They come from a full closet, a piano nobody mentioned, a subfloor surprise that needs a decision, or a dumpster that was never booked. Each of those can be handled days earlier. The countdown below is ordered by when things need doing, not by room.

The countdown

0 done

Two weeks out

One week out

Two days before

The night before

Install day

The first two days after

Your ticks are saved only in this browser, on this device. Nothing is sent anywhere.

Your job or the crew's?

Responsibilities vary by installer and by what the quote includes, so treat this as the list of things to confirm, not a promise of who does what.

Typical split of prep work. Confirm each line with your installer.
TaskUsually the homeownerOften the crew, if quoted
Small items, closets, shelvesYesRarely
Large furnitureSometimesOften, for a fee or included
Electronics and wiringYesRarely
Tear-out of old carpet and padOptional, to save laborUsually
Haul-awaySometimesOften
Subfloor repairRarelyQuoted when found
Door trimmingSometimesSometimes
Baseboard and quarter roundPaint touch-upRemoval and refitting for hard floors
The decision you will be asked to make

If the crew finds rot, a soft spot or water damage once the old floor is up, work stops until someone decides. Agree in advance how that will be handled: who can approve it, how it will be priced, and whether you want photos before anything is cut out.

Extra prep when carpet becomes a hard floor

A carpet to hard floor swap involves more than the floor itself. The carpet was hiding the subfloor, it sat against the baseboards, and it was thicker or thinner than what replaces it.

  • Subfloor flatness. Floating floors need a flat surface. Expect the installer to check it once the carpet is up and to quote leveling if needed.
  • Baseboards and quarter round. Carpet tucks under baseboards; hard floors leave an expansion gap at the walls that is covered by baseboard or quarter round. Ask whether baseboards will be removed and reinstalled, or whether quarter round will be added, and who paints it.
  • Squeaks. With the subfloor bare, squeaky spots can be screwed down. Walk the floor and mark them.
  • Acclimation. Some flooring products must sit in the home at normal living temperature and humidity before install. Keep heating or cooling running normally. In an Atlanta summer that means the air conditioning stays on, even if the house is empty, and boxes of flooring wait inside the house rather than in a hot, humid garage.
  • Appliances. If the kitchen or laundry is included, plan for disconnecting and moving the refrigerator, dishwasher, washer and dryer.
Door off its hinges leaning against a hallway wall with labeled boxes stacked beside it
A clear path from the door to every room saves the crew time. Illustrative image.

Pets, kids and air quality

Tear-out raises years of dust, and installation means sharp tools, tack strip with exposed pins, open doors and people carrying heavy rolls. Pets and young children are safest out of the house for the day. If that is not possible, keep them in a closed room well away from the work, with a sign on the door.

Anyone with asthma or allergies may want to be elsewhere during tear-out too. Run the bathroom and kitchen exhaust fans, open windows if weather allows, and change your HVAC filter after the job: it will have caught a lot of what came up with the old carpet.

In Atlanta, timing changes the advice. During the spring pollen peak, usually March into April, an open front door for a day of carrying rolls lets a lot of pollen in, and opening every window to clear tear-out dust trades one irritant for another. On those days, run the exhaust fans and HVAC fan with a fresh filter instead, and plan a careful vacuum of the new floor once the crew leaves. In summer, ask the crew to keep doors closed between trips so the air conditioning can keep up with the humidity.

An empty room and a decided plan are the two things you control. Everything else goes faster because of them.

If you have not yet decided how the old carpet leaves the house, the removal and disposal guide covers the options. If you are still choosing materials, start with the room by room comparison.

Questions about installation day

Do installers move furniture?

Some do, some charge for it, and many will not move certain items at all: pianos, aquariums, gun safes, beds with electronics, china cabinets that are still full. Ask when you get the quote, and assume anything fragile or valuable is yours to move.

Can I stay home during installation?

Usually, yes, though you will want to be out of the rooms being worked on. Tear-out is dusty and noisy, and installers need clear paths to carry rolls and tools. Plan for pets and small children to be elsewhere for the day.

How soon can furniture go back?

On new carpet, typically as soon as the installer is done. Hard floors vary: glue-down products may need time for the adhesive to set, and some floating floors are ready right away. Follow the product's instructions and put felt pads on furniture legs before moving anything back onto a hard floor.

Is the new carpet smell harmful?

New carpet, pad and adhesives can release volatile organic compounds that cause the smell, which fades with ventilation over the following days. Opening windows and running fans helps. The Carpet and Rug Institute runs a Green Label Plus program that tests carpet and adhesives for low emissions, which you can ask about when choosing a product.

In three words

The short version

  1. 01

    Clear it.

    Empty the rooms of small items, breakables and anything on the floor before the crew arrives.

  2. 02

    Plan around.

    Pets, kids, parking and the path from the truck to the room all need a plan on install day.

  3. 03

    Air it out.

    Keep dust contained to the work rooms and ventilate during and after the install.